After a long segment of waiting for our turn, we have some movement from the factory. I have a sample product being delivered; the delivery is scheduled to arrive Monday the 8th. When it gets here, I’ll tear it open like a greedy kid on Christmas and get you some pics and video. I’ll go over it in fine detail. If it meets with approval from everyone on the team, we go to production. 

From there, it should not be much longer. I’ll need to pay for the production run. The setup fees are already paid, so the factory is ready to roll as soon as we get that step out of the way. 

I’ll keep you informed of each of these steps as they come up–the delivery of the sample, my approval or request for changes, and then the production and subsequent delivery. 

Notes: the sample copy in this video doesn’t contain multiple copies of things that should have multiple copies (like the objective tokens and player pawn (fedoras). It also doesn’t have the dice, which have since been added. This video was shot at the factory prior to sending it to me.